Shutdowns & Revamps
Abu Dhabi, UAE
Upgrade of an oxygen injection system within a steel plant, including piping modifications, valve replacement and associated E&I work during a planned maintenance window.
Project Year
2018
Industry
Steel Manufacturing
Contract Type
Lump Sum
Project Value
Confidential
Project Overview
ELGC carried out the upgrade of an oxygen injection system at a steel manufacturing facility in Abu Dhabi during a planned maintenance window.
The scope included piping modifications, valve and instrument replacement, pressure testing and recommissioning within the planned outage period.

Technical Details
Client
Confidential Client
Location
Abu Dhabi, UAE
Project Duration
12 Months
Built-up Area
N/A
Structure Type
Industrial Structure
Business Unit
Shutdowns & Revamps
Scope of Work
Piping modifications and spool replacement
Valve and instrument replacement
E&I disconnection and reconnection
Pressure testing and leak checking
Recommissioning and system handback
Key Highlights
All piping modifications completed within planned window
Pressure testing passed before system restart
E&I scope integrated within same team